Industrial Service
Epoxy Flooring
Industrial epoxy, urethane, and polyaspartic floor coatings.
Heavy-duty floor systems engineered for forklift traffic, chemical exposure, and food-grade environments.
Common Failures
- Worn or delaminating coatings
- Stained or contaminated substrate
- Failed line striping
Signs Repair Is Needed
- Bare concrete showing through
- Coating peeling at joints
- Cleaning no longer effective
Repair Process
- 01Shot-blast or diamond grind prep
- 02Crack and joint treatment
- 03Prime, base, and topcoat
- 04Re-stripe forklift lanes and safety zones
Safety Considerations
- Ventilation for solvent products
- Slip-resistant aggregate where required
Frequently Asked
How long before forklift traffic?
24–72 hours depending on system.
Do you do food-grade?
Yes — USDA/FDA compliant urethane systems.
Get on our schedule
Need epoxy flooring at your facility?
Talk to an industrial repair manager. Site walks, scoping, and emergency dispatch.