Industrial Service

New Loading Ramps

Design-build cast-in-place and steel loading ramps for new and expanding dock operations.

We design, engineer, and build new loading ramps from the ground up — drive-on truck ramps, forklift ramps between grade changes, and dock-leveling approach ramps engineered for daily heavy traffic.

Common Failures

  • No truck access at grade
  • Existing ramp slope out of code
  • Forklift transitions between elevations

Signs Repair Is Needed

  • New dock door without approach
  • Adding trailers to a non-dock building
  • Mezzanine or yard grade change

Repair Process

  1. 01Site survey and grading plan
  2. 02Structural engineering and stamped drawings
  3. 03Permit submittal
  4. 04Excavation, rebar, and form
  5. 05Pour and cure with traffic-rated finish

Safety Considerations

  • Slope and traction engineered for loaded forklifts
  • Edge protection and curbing per OSHA
  • ADA-compliant where required

Frequently Asked

Do you handle the engineering and permits?

Yes — full design-build with stamped structural drawings and permit handling.

How long does a new ramp take?

Typical drive-on ramp is 3–6 weeks from notice to proceed, depending on permitting.

Get on our schedule

Need new loading ramps at your facility?

Talk to an industrial repair manager. Site walks, scoping, and emergency dispatch.