Lean-tos, expansions, and full additions to existing industrial buildings.
Add square footage to existing facilities — clear-span lean-tos, full bay expansions, or attached office and dock additions.
Common Failures
- Outgrown facility footprint
- Need for covered staging or storage
Signs Repair Is Needed
- Production bottlenecks from space
- Inventory or equipment stored outside
Repair Process
- 01Site survey and program
- 02Design-build with engineer
- 03Permit
- 04Foundation, steel, envelope, MEP
Safety Considerations
- Construction zone isolation from operations
- Engineered crane picks
Frequently Asked
How long is a typical addition?
12–28 weeks depending on size and permitting.
Can you tie into existing utilities?
Yes — we coordinate MEP and structural tie-ins.